Home
Home
Public Involvement
Schedule
Newsletters
Contacts
Feedback

Public Release Report

In order to view these documents, you will need the Adobe® Acrobat® Reader™ available from Adobe Systems, Inc. Click here to go to the Adobe Acrobat Reader download site.

Cover

Preface

Executive Summary (to be completed following additional public comment)

Chapters

Chapter 1
Chapter 2
Chapter 3
Chapter 4a
Chapter 4b
Chapter 5
Chapter 6

Chapter 7
Chapter 8

Figures

Figure 1.1 Study Area Boundary
Figure 2.1 Public Identified Issues
Figure 3.1 Urban Limits, Census Tracts, and Schools
Figure 3.2 Projected Population Growth and Decline (2025)
Figure 3.3 Projected Housing Gains and Losses (2025)
Figure 4.1 Functional Classifications
Figure 4.2 On-System Routes
Figure 4.3 Existing 2005 Volume / Capacity Conditions
Figure 4.4 Annual Average Daily Traffic (AADT)
Figure 4.5 Signalized Intersections
Figure 4.6 Speed Study
Figure 4.7 Truck Routes
Figure 4.8 Accident Locations
Figure 4.9 Existing Transit Routes for “The Bus”
Figure 4.10 School Districts No. 1 Primary Bus Routes
Figure 4.11 Existing and Proposed Trails
Figure 4.12 Tour Routes
Figure 4.13 Rail Lines
Figure 4.14 Snow Routes
Figure 4.15 EMS/Fire Districts
Figure 4.16 Committed Projects
Figure 5.1 Average Daily Traffic 2025
Figure 5.2 2025 Volume/Capacity Conditions
Figure 5.3 Volume Impacts of Busch Ave. on Avg. Daily Traffic 2025
Figure 5.4 Volume Impacts of Floral Blvd. On Avg. Daily Traffic 2025
Figure 5.5 Off-Ramp at I-90/I-15 Interchange
Figure 5.6 Volume Impacts of Iron St. on Avg. Daily Traffic 2025
Figure 5.7 Volume Impacts of Hanson Loop on Avg. Daily Traffic 2025
Figure 5.8 Volume Impacts of Tram Rd. on Avg. Daily Traffic 2025
Figure 6.1 Summary of Proposed Transportation Improvements/Alternatives
Figure 6.2 Harrison Ave. and Amherst Ave.
Figure 6.3 Harrison Ave., Page 1
Figure 6.4 Harrison Ave., Page 2
Figure 6.5 Harrison Ave., Page 3
Figure 6.6 Harrison Ave., Page 4
Figure 6.7 Harrison Ave., Page 5
Figure 6.8 Harrison Ave., Page 6A
Figure 6.9 Harrison Ave., Page 6B
Figure 6.10 Harrison Ave., Page 6C
Figure 6.11 Hanson Loop Connector Rd.
Figure 6.12 Hanson Rd. Improvements
Figure 6.13 Mercury St. Heritage Loop
Figure 6.14 Iron St. Access to Montana Tech
Figure 6.15 Terra Verde – Little Basin Creek Connector
Figure 6.16 Bluebird Trail Improvements
Figure 6.17 Bluebird Trail Improvements
Figure 6.18 Bluebird Trail Improvements
Figure 6.19 Our Lady of the Rockies Tram Rd.
Figure 6.20 Harrison Ave. at I-90 Eastbound Off-Ramp
Figure 6.21 Texas Ave. Realignment
Figure 6.22 Busch Ave. Improvements
Figure 6.23 Arizona St. Improvements at Curtis St.
Figure 6.24 Wyoming Ave. / Arizona St. Connector

Appendices

Appendix A
Appendix B
Figure A.4 Urban Limits and Census Tracts
Figure A.7 Projected Population Growth and Decline
Figure A.9 Projected Housing Gains and Losses
Figure A.12 Retail Employment 2025 Census Block Level
Figure A.13 Non-retail Employment 2025 Census Block Level